Chantier fluvial de Castelsarrasin

Description

Le nouveau chantier fluvial de Castelsarrasin vient de voir le jour. Il est toujours dirigé par Bernard, rejoint par ses deux fils Christophe et Sébastien.
The new shipyard of Castelsarrasin has just been created. He is still managed by Bernard, joined by his two sons Christophe and Sébastien. This new site, located a few meters from the old, covers 2.5 hectares of fenced and concreted with more than 100 dry sites, 2 places sheltered for work, and 3 places on a fairing area. The brand new premises include a workshop of 120m2, a store 70m2 and sanitary and showers. Services offered: crane, water outlet with hydraulic trailer (15t max), refueling, black water drainage, mechanical repair, fairing, painting, transport, towing boats

Spoken languages : French

Opening

All year round.

Location

Chantier fluvial de Castelsarrasin
Chemin des 2 ponts 82100 Castelsarrasin

Route & access

06 23 14 75 58

06 23 84 56 89

06 23 25 80 36

Website